Timber Frame vs Block Extensions

Call 07789990629

By Alex Gregory·Published 23 November 2026

Both make a good extension, and the right one depends on the house, the site and the timescale rather than on one being better. A block extension is built the traditional way, with two leaves of masonry and insulation in the cavity, laid course by course on site. A timber frame extension is built from structural timber panels fixed to a masonry base, then sheathed, insulated and finished outside in brick, render or cladding. From the street the two can look identical.

The differences are in how they go up. Timber frame is usually quicker to get to a weathertight shell and lighter on the foundations, while blockwork is heavier and more solid and suits sites where the build has to tie closely into existing masonry. Both have to meet the same building regulations. This guide explains each method, compares them on the points that matter to a homeowner, and covers how the choice affects planning.

How a block extension is built

A block extension starts with foundations and a ground floor slab, then an inner leaf of concrete blockwork and an outer leaf of brick or block, with a cavity between them that is insulated. The walls are built up course by course in mortar, with lintels over the openings, until they reach the height of the roof, which is then built on top.

It is the way most British houses of the last century were built, so it ties in naturally with an existing brick or block house. Because the walls themselves are heavy and solid, they are good at holding heat and dampening sound, and fixing a kitchen or a heavy shelf to them is straightforward.

The trade off is that blockwork is a wet trade. Mortar needs to cure, the walls go up at the pace of the bricklayers, and very cold or very wet weather can slow the work or stop it.

How a timber frame extension is built

A timber frame extension usually starts the same way, with foundations and a slab or a low masonry base. On top of that go structural timber wall panels, which the Structural Timber Association describes as open panel systems of treated softwood framing with a structural sheet such as ply or OSB fixed over it and a breather membrane outside, or closed panel systems that arrive with the insulation already built in. The panels carry the floor and roof loads down to the foundations.

Once the frame is up, the roof goes on and the shell is made watertight. The outside can then be finished in a brick outer leaf, render or timber cladding, and the inside is insulated, boarded and plastered like any other room.

The timber frame extensions on our work page show exactly that stage, with OSB sheathed panels standing on a blockwork base and, on another job, a frame rising off a new brick plinth beside the house. It is carpentry as much as building, which is why a carpenter's skills matter on this kind of job. We also have the other method on the same page, a new build taken from the floor structure through blockwork to roof trusses.

Timber frame and block compared

Speed. Timber frame usually reaches a weathertight shell faster, because the frame goes up in days rather than weeks and does not wait for mortar to cure. The Structural Timber Association says that speed of construction reduces build programmes. The overall job is not always proportionally shorter, because the foundations, the roof, the services and the finishes take the same time either way, but the house is open to the weather for less of it. Our guide to how long a house extension takes covers the full timeline.

Weather. Blockwork can be held up by frost and heavy rain. A timber frame is less weather dependent once it is up, but the timber has to be kept dry until the roof and membrane are on, so the sequence needs planning.

Foundations. A timber frame is lighter than masonry, which can make a difference on poor ground or where the foundations are a large part of the budget. Your structural engineer and building control will set the foundation design either way.

Insulation. Both methods can meet the insulation standards in Approved Document L. Timber frame puts most of its insulation between the studs, so the walls can be slimmer for the same performance, which can give you a little more floor space inside the same footprint. Blockwork relies on cavity insulation, sometimes with insulated plasterboard inside.

Sound and solidity. Masonry walls are heavier and feel more solid. A timber frame wall can perform well too, but heavy items such as wall cupboards and televisions need to be planned for, with noggins or ply fitted behind the boards where they will hang.

Cost. Neither is reliably cheaper. Timber frame saves labour time on site but the frame itself can cost more, and blockwork uses cheaper materials but takes longer to build. The finishes, the roof and the glazing tend to decide the budget more than the walls do. Our guide to how much a house extension costs covers the bigger picture, and the cheapest way to extend a house looks at it from the other direction.

Planning permission and the look of the outside

The choice of structure does not change whether you need planning permission. The method you build with matters far less to the council than what the finished extension looks like.

That is where the outside finish comes in. If you are building under permitted development, the Planning Portal's guidance on extensions says the materials used in any exterior work must be of a similar appearance to those on the exterior of the existing house. A timber frame extension with a brick outer leaf to match a brick house is straightforward. A timber clad extension on a brick house may not meet that condition, and in a conservation area or other designated land the guidance says the work cannot include cladding of the exterior at all. If the look you want differs from the house, plan for a planning application. Our guide to when you need planning permission explains the wider rules, and building work in conservation areas covers the extra controls there.

Building regulations apply to both methods equally, covering the structure, fire safety, insulation, ventilation and drainage. Our guide to whether you need building regulations approval explains the routes.

How to choose for your house

Start with the house itself. A brick house with a straightforward rear extension can be built either way, and the decision often comes down to timing, the site and how quickly you want the shell closed in. If the work starts in late autumn or winter, the speed of a timber frame to a watertight shell can be a real advantage. If the extension has to bond into existing masonry, sits on a tight site where panels are hard to get in, or is a small single room, blockwork is often the simpler route.

Think about what happens inside as well. If the plan includes a knock through into the existing house, the steels and the structural wall work are the same whichever method the new walls use. A kitchen in the new space will be hung on those walls, so if it is timber frame, tell your builder where the cupboards will go before the boards go on. Our guide to the steps in a house extension shows where each of those decisions falls.

And ask the person building it. A builder who works in both methods can tell you which suits your site, and should be able to show you jobs built each way.

Conclusion

Timber frame and block extensions both meet the same building regulations and can look the same from outside. Timber frame is quicker to a weathertight shell, lighter on the foundations and can give slimmer walls, while blockwork is heavier, more solid and ties in naturally with existing masonry. Neither is reliably cheaper. The outside finish matters more for planning than the structure does, so a timber frame clad differently from your house may need an application.

If you are planning an extension in Kent, AGC Carpentry & Building Services is based in Ashford and works across the county, including Maidstone, Canterbury, Folkestone, Hythe and Dover. You can see timber frame and block jobs on our work page, and contact us to talk through which suits your house.

Written by Alex Gregory

30 years in carpentry, joinery and building, based in Ashford and working right across Kent.

More about how I work
30 years on site

BUILT TO LAST

Nothing here is subbed out and forgotten. The person who quotes your job is the person on site running it, and the same person you ring in two years when you want a door hung.

How we work

Thinking about a project

Send a few details, or ring and talk it through. Either way you get a straight answer about what is realistic.

Get a quoteCall us